COMMISSIONING REQUEST FORM
SNo |
MANDATORY MEASURES |
REMARKS (Yes/No) |
1 |
Pipe connections to the pump set for Suction / Discharge |
|
2 |
All Electrical connections up to control panel done |
|
3 |
Electricity is present at site |
|
4 |
Water is available at site |
|
5 |
Float switch cable connected from pump panel to the tank |
|
By signing this form, you confirm that the site is ready for Testing & Commissioning of the pumping
system supplied by M.A.H.Y. Khoory & Co. LLC. In an unlikely event that our service representative
has to return without completing the task due to any above mentioned requirements, our obligation of
Free of Cost commissioning job is over and the succeeding scheduled visit shall be on chargeable
basis with the cost Dhs. 500/- per visit.